31/08/2015 walk thru

walked through the house today to measure up with some work we will get done after handover. measured up the laundry...we will rip out the tub and install stone benches with under mount sink and cupboards.....have a huge linen cupboard and broom cupboard in there so wont need too much in the way of storage. wardrobe measured up also to get fitted out after handover. My brother who is a carpenter was a bit shocked at the state of the place, mud, dust and rubbish throughout the inside, was surprised they would paint a house with so much crap around.... I just want to get in there and clean it all up..... The only updates I can see are the cutlery drawer has been put in. will visit Hettich and replace this later on.

Our tiler came to have a look at the floors and see how even they are. Said we have no choice but to stick down now that the skirting is down. That's what mac jones would have done anyway had we purchased flooring through them. Saves a couple of days we are happy to do that.

Supervisor mentioned electrician tomorrow and plumber the day after and benches should be installed this week too.

painting not finished outside but here is what the Moroka paint looks like. I don't like they grey but can always redo later or see if it grows on us ....







1 comment:

  1. Heya - loving this blog. So did you have the laundry tub put in by MJH and then you ripped it out to do the storage and bench yourself?

    ReplyDelete